|
REVELYST
Amazon Operations
|
|
257 items need action
$131,819 of exposure across 1 rule.
Generated 2026-08-27 23:42 UTC for amazon-ops@revelyst.com.
|
CRITICAL
Stockout imminent: under 10 days, no inbound
257 items · All brands
|
CamelBak Skyline LR 10 Olive L at PHX3: 0 days of supply
0 units on hand against 21.8/wk. Inbound 0. Reorder point is 93 units at a 30 day lead time.
Do: Raise a replenishment PO for 140 units, or reallocate from a node with cover.
|
$10,908
|
|
Bushnell Nitro 3-12x44 Riflescope Graphite OS at DFW6: 0 days of supply
0 units on hand against 19.7/wk. Inbound 0. Reorder point is 84 units at a 30 day lead time.
Do: Raise a replenishment PO for 127 units, or reallocate from a node with cover.
|
$9,500
|
|
CamelBak Chute Mag 1L Bottle Olive L at STL8: 0 days of supply
0 units on hand against 10.9/wk. Inbound 0. Reorder point is 47 units at a 30 day lead time.
Do: Raise a replenishment PO for 70 units, or reallocate from a node with cover.
|
$8,859
|
|
Primos Hook Hunter Diaphragm Camo XL at RIC2: 0 days of supply
0 units on hand against 24.5/wk. Inbound 0. Reorder point is 105 units at a 30 day lead time.
Do: Raise a replenishment PO for 158 units, or reallocate from a node with cover.
|
$8,678
|
|
Simms Fishing Dry Creek Z Sling Blue S at ONT8: 0 days of supply
0 units on hand against 23.5/wk. Inbound 0. Reorder point is 101 units at a 30 day lead time.
Do: Raise a replenishment PO for 151 units, or reallocate from a node with cover.
|
$5,679
|
|
Fox Racing Ranger 2.5 Short Graphite L at ONT8: 0 days of supply
0 units on hand against 11/wk. Inbound 0. Reorder point is 47 units at a 30 day lead time.
Do: Raise a replenishment PO for 71 units, or reallocate from a node with cover.
|
$4,006
|
|
CamelBak Eddy+ 32oz Black M at LAS1: 3 days of supply
3 units on hand against 8.2/wk. Inbound 0. Reorder point is 35 units at a 30 day lead time.
Do: Raise a replenishment PO for 50 units, or reallocate from a node with cover.
|
$3,717
|
|
CamelBak Fourteener 24 Olive M at LAS1: 0 days of supply
0 units on hand against 4.9/wk. Inbound 0. Reorder point is 21 units at a 30 day lead time.
Do: Raise a replenishment PO for 32 units, or reallocate from a node with cover.
|
$3,581
|
| 249 further items on this rule. Open the alerts inbox for the full list. |
Condition: Days of supply < 10 AND inbound units = 0
|
|
Sent by Revelyst Amazon Operations. Thresholds and recipients are configured on the Automations page.
This is a demonstration environment: figures are fabricated and no action was taken in Amazon.
|
|